MIRAMAR INFRASTRUCTURE IMPROVEMENTS & SERVICE CONVERSIONS, PHASE III

LOCATION

Miramar, FL

OWNER/CLIENT

City of Miramar

COST

$6M (Initial Estimate $8M)

COMPLETION

2020

  • Civil Engineering Analysis & Design 
  • New Water Distribution System Mains 
  • New Water Meter Boxes 
  • As-Built Drawings 
  • Utility Coordination 
  • Permitting 
  • Interagency Coordination 
  • Construction Phase Engineering & Inspection Services 
  • Roadway Resurfacing & Reconstruction 
  • Signage & Street Markings 
  • Horizontal Directional Drilling 
  • Construction Contract Administration 
  • Construction Submittal 

The Miramar Infrastructure Improvements and Service Conversions, Phase III project involved the design and construction oversight of over 72,000 LF of residential water main, including a 100 LF horizontal directional drilling operation. The design included a new 6-inch PVC and DIP water main, new water services, new water meter boxes and service connections, and complete roadway restoration. The roadway restoration includes a full depth trench restoration, edge of pavement to edge of pavement milling, and a final overlay, and complete striping for each street.

During our design effort, we realized that the City lacked accurate and complete as-builts for the sanitary sewer system. As part of our effort, we provided all sanitary sewer details to the City GIS department to allow them to update their utility records.